What Steps Are Involved In A Kitchen Remodel?

Kitchen Remodeling Companies: What Steps Are Involved?

If you’ve decided it’s time for a major home upgrade and you’re looking at your kitchen, then working with experienced kitchen remodeling companies is probably your best bet for timely, quality results. But once you’ve talked to the many kitchen remodeling companies and found the one you want to work with, what exactly are the steps that will take place? What can you expect from a kitchen remodeling experience?

Demolition

Once you’ve started working and have approved your kitchen plans, the first and most obvious step is the demolition portion. A lot of demolition is involved if a kitchen remodeling project is drastic, such as increasing the size of the kitchen itself, tearing down walls, and going open concept.

Countertops and cabinets may be removed; wallpaper stripped if there is any, and even floor tile is taken away if this is a massive space overhaul.

Plumbing & Electrical

Once everything has been removed, the first step is “infrastructure.” Wiring and plumbing can only be easily done once walls and flooring are removed since this is the only time installation can occur without significant damage to the rest of the kitchen.

If you’re adding more electrical outlets, relocating the position of a sink or dishwasher, or even adding a fridge that dispenses water, this is when new electrical wiring and plumbing occur. It’s also important to ensure that if there have been any updates to standards for electrical wiring, the new electrical is up to current codes.

Paint The Walls

Once the walls have been restored, it’s time to paint them. This is much easier to do in an empty room before cabinets and counters have been installed that need to be painted around. You can always put this phase later, but you create more obstacles that need to be protected when you do so.

Install The Floors

With the electrical installed, pipes laid out, and walls painted, the next step for kitchen remodeling companies is to put in the new floor tile. It’s better to have a finished floor ready and waiting for building counters and cabinets on top of it. It’s also easier to do this now before any appliances have been installed.

Add Cabinets

Now is the time for the cabinets to come, once the “foundation” has been laid out. This process must be taken with care and scrutiny to ensure the framework is solid and will provide years, if not decades, of reliable operation once everything is in place.

Countertops

When the cabinets and their framework are in place, it’s finally time to put in the countertops. This is typically a custom job since the measurements will need to match whatever the dimensions of your kitchen are. Once done, however, the countertops should be solid and immovable.

Appliances

Now that everything else has been done, it’s time to finally move in the large appliances. The refrigerator, oven range, hood ventilation, and dishwasher are all possible appliances installed. Assuming you were careful and made a note of appliance measurements, they should fit snugly alongside any counters and cabinetry you have if your planning was correct.